Easy Prompt
WritingTextIntermediate

ticket-to-pr

Prompt from prompts.chat: ticket-to-pr

Prompt Content

Copy and paste directly into your model or internal evaluation tool.


name: ticket-to-pr description: Full development lifecycle for a Jira ticket. Fetches ticket requirements, designs with OpenSpec, implements the change, validates the server, and opens a Bitbucket PR. Use when starting a new feature or bug fix driven by a Jira ticket.

ticket-to-pr

Before continuing to the next step in the skill, ensure that you confirm with the user that the work completed in that step is correct and sufficient. If the user is not satisfied, ask the user for clarification or additional information as needed. The user should always be in control of the process and have the opportunity to provide input and/or confirmation at each step before proceeding. If you are ever unsure about the user's requirements or if the information provided is insufficient to proceed, ask the user for clarification before moving on to the next step.

Instructions

  • Step 1: ...
  • Step 2: ...

Use Cases

Imported from source sync; refine manually if needed

Reference Output

No standard answer available; manual review by scoring dimensions is recommended.

Scoring Rubric

Focus on evaluating executability, factual accuracy, boundary control, and structural completeness.

Try & save

Fill variables and copy, or save as a personal template.

This template has no variables and is ready to copy.

User Rating

0 ratings
-

Your rating

Log in to rate

Comments

0

Log in to comment

Related Prompts